ScienceEngineering

Mulch
calculator.

Turn the size of your beds into cubic yards and bags of mulch, soil or gravel.

How it's worked out

You need a volume: the ground you want to cover, times how deep you spread it. Work out each bed's area from its shape, add them up, then multiply by the depth.

rectangle\displaystyle \text{rectangle}=L×W\displaystyle {}= L \times W
circle\displaystyle \text{circle}=π(d2)2\displaystyle {}= \pi \left(\frac{d}{2}\right)^2
triangle\displaystyle \text{triangle}=b×h2\displaystyle {}= \frac{b \times h}{2}

With the area in square feet and the depth in inches, divide by 12 to get cubic feet. Bulk material is sold by the cubic yard, and a cubic yard is 27 cubic feet, since 1 yd = 3 ft and 3 × 3 × 3 = 27.

ft3\displaystyle \text{ft}^3=area×depth12\displaystyle {}= \frac{\text{area} \times \text{depth}}{12}
yd3\displaystyle \text{yd}^3=ft327\displaystyle {}= \frac{\text{ft}^3}{27}

Bags are the cubic feet over the size printed on the bag, rounded up, since a store will not sell you part of one. Metric bags are often sold in liters; the calculator turns them into cubic feet with the NIST factor, 1 ft³ = 28.32 L. For an odd-shaped bed, split it into rectangles, circles and triangles and enter each as its own area.

Worked examples

Dana mulches a 20 by 10 ft bed

The bed is 200 sq ft. At 3 inches that is 50 ft³, or 1.85 yd³, which is 25 bags of 2 ft³.

Bulk at $40 a yard, on 2 yd³, costs $80.00. 25 bags at $4 cost $100.00. Bulk wins by $20.00, before any delivery fee.

Open this example in the tool

A border, a bed and a tree ring

A 30 by 4 ft border and a 12 by 6 ft bed are rectangles. The ring around a tree, 6 ft across, is a circle of 28.3 sq ft. Together they cover 220 sq ft.

At 3 inches that takes 2.04 yd³, or 28 bags of 2 ft³. Keep the ring's mulch back from the trunk itself.

Open this example in the tool

A 5 by 2 m bed in centimeters and liters

Ten square meters at 7.5 cm is 0.75 m³ of mulch. In 50 L bags that is 15 bags.

Switching the lengths to meters keeps the same bed on screen, so you can check a store's cubic yard price against the same job.

Open this example in the tool

Reading your result

How deep to go. For wood mulch, Illinois Extension advises 2 to 3 inches, and Penn State Extension gives 2 to 4 inches around trees, less on poorly drained soil. Too much can starve roots of oxygen and keep the root zone wet.

Depth moves the bill most. Dana's bed needs 1.23 yd³ at 2 inches and 2.47 yd³ at 4 inches. Each extra inch costs the same again, so measure the depth you have before topping up.

Weight depends on the load. It changes with the material and how wet it is. If you are hauling it yourself, ask the yard for its weight per cubic yard and enter it to see the load.

Bags and yards round differently. Bags round up to whole bags, so Dana's 25 bags hold 50 ft³ against the 50 ft³ needed. Bulk is priced here on the next quarter yard, so her 1.85 yd³ is billed as 2 yd³, and the extra 4 ft³ tops up low spots. Ask the yard how it rounds before you compare.

Mulch settles. Fresh mulch looks deeper at first than it ends up, as Illinois Extension notes. Spread to your target and check again after rain.

Common mistakes

Mixing up inches and feet. Three inches is a quarter of a foot. Multiplying 200 sq ft by 3 instead of 0.25 gives 600 ft³ in place of 50.

Measuring a raised bed from the outside. The frame boards take up room that holds no soil. Measure inside the boards, where the soil goes, and to the depth you will actually fill.

Piling it against trunks. Penn State advises keeping all mulch away from the trunk, and pulling back an over-mulched ring 3 to 5 inches from young trees and 8 to 10 inches from mature ones.

Topping up without checking. Adding a full layer every year on top of the old one builds up too much. Measure what is left first, then add only the difference.

Questions people ask

324 sq ft at 1 inch, 162 sq ft at 2 inches and 108 sq ft at 3 inches, because a cubic yard is 27 cubic feet. In metric, a cubic meter covers 100 m² at 1 cm deep, or 10 m² at 10 cm.

Sources