- Short tons
- 7.6
- Cubic meters
- 4.15 m³
- Area
- 400 sq ft
Order 7.6 tons. Tamping settles loose gravel by about 15 to 20%, so to finish at 4 in, spread it 4.7 to 5 in deep before you compact it.
Price and delivery
Already have a load?
- Covers at 4 in
- 579 sq ft
- Depth over your 400 sq ft
- 5.79 in
The area, to scale
Drag the corner to resizeA rectangle 40 ft by 10 ft, 400 sq ft. At 4 in deep with 10% extra it takes 5.43 yd³.
The same area at other depths
| Volume | ||
|---|---|---|
| 2 in | 2.72 yd³ | 3.8 |
| 3 in | 4.07 yd³ | 5.7 |
| 4 in (yours) | 5.43 yd³ | 7.6 |
| 6 in | 8.15 yd³ | 11.41 |
| 8 in | 10.86 yd³ | 15.21 |
How it's worked out
Gravel is sold by volume or by weight, so the sum runs in three steps. Find the area, multiply by the depth for the volume, then multiply by the weight of a cubic yard of your stone.
A is the area in square feet and d the depth in inches. Dividing by 12 turns inches into feet, and 27 cubic feet make a cubic yard. ρ (rho) is the density in short tons per cubic yard. A circle uses π times the radius squared, and a triangle half the base times the height. The extra you add for compaction and waste goes on the volume.
Density depends on the stone and the yard. Lorusso Corporation lists 1.35 tons per cubic yard for its crushed stone and 1.7 for 3/4 in dense graded base. Smoky Mountain Sand & Gravel uses 1.3 for pea gravel and river rock. These are each supplier's own planning figures, so ask yours for theirs.
Metric works the same way. The tool converts every size, and NIST gives 0.7646 cubic meters in a cubic yard and 907.18 kg in a short ton.
Worked examples
Marcus orders stone for a 40 by 10 ft driveway
The driveway is 400 sq ft. At 4 in deep that is 4.94 cubic yards, and the 10% extra brings it to 5.43. At 1.4 tons a cubic yard Marcus orders 7.6 tons.
At $45 a ton the stone costs $342.22, and with $75 for delivery the bill is $417.22. Going to 5 in deep would take 9.5 tons instead.
Ines spreads pea gravel on a round patio
A circle 12 ft across covers 113.1 sq ft. Four inches deep with 10% extra makes 1.54 cubic yards.
Using Smoky Mountain's figure of 1.3 tons a cubic yard for pea gravel, that weighs 2 tons. Some suppliers sell small orders by the cubic yard, so check how yours prices it.
Ravi lays a metric path and checks a 10 ton load
A path 9 m long and 1 m wide is 9 m². At 5 cm deep with 5% extra it needs 0.47 m³ of crushed stone, which is 0.76 metric tons at 1.35 tons a cubic yard.
A 10 ton load would cover 113 m² at that depth, far more than the path. Ravi can order the smaller amount or use the rest elsewhere.
Reading your result
Yards are what you spread, tons are what you pay for at most quarries. The same 40 by 10 ft driveway at 4 in weighs 7.1 tons in pea gravel at 1.3 and 9.2 tons in dense graded base at 1.7.
Loose stone settles. Smoky Mountain Sand & Gravel says loose gravel shrinks about 15 to 20 percent when tamped. To finish at 4 in, spread about 4.7 to 5 in loose, which is what the extra allowance pays for.
Odd shapes are sums of simple ones. Split an L-shaped yard into two rectangles and add them, or treat a rounded end as half of a circle the same width. A triangle uses its base and the height at right angles to it, not the sloping side: a 12 ft base with a 9 ft height is 54 sq ft, which takes 0.5 yd³ at 3 in deep before any extra.
Reading it backwards. One ton at 1.4 tons a cubic yard covers 77 sq ft at 3 in deep. Ten tons over 400 sq ft gives 5.8 in. Use these to check a delivery before you spread it.
Common mistakes
- Entering depth in feet. Depth goes in inches or centimeters. Four feet instead of four inches makes the order twelve times too big.
- Using one density for every stone. Dense graded base is heavier than pea gravel per cubic yard, so the same volume can differ by tons.
- Mixing short tons and metric tons. A US short ton is 907.18 kg and a metric ton is 1,000 kg, so 10 metric tons is 11.02 short tons. Ask which one the price list means.
- Forgetting the edges. Measure to the outside of any edging, and include the flared mouth of a driveway.
- Ordering to the exact figure. Uneven ground and settling eat into the stone. Keep some extra, then round to what the supplier delivers.