Concrete & Cement
calculator.
Work out the cubic yards of concrete for a slab, post holes or steps, and the bags it takes.
- Bags of 80 lb
- 62
- Weight, about
- 5,500 lb
- Before the allowance
- 1.23 yd³
That is 62 bags of 80 lb, about 5,500 lb to lift and mix. Compare that with a ready-mix quote by the cubic yard.
Bags, waste and prices
The pour
Slab or footing: 0.9439 m³ before the allowance, 1.36 yd³ to order, 62 bags of 80 lb.
Working
- 1Volume of the slab or footinglength × width × thickness = 0.9439 m³
- 2Add the waste allowance0.9439 × (1 + 10%) = 1.038 m³
- 3In cubic yards: 1 yd³ = 0.764555 m³1.0380.764555= 1.36 yd³
- 4Bags: divide by the 80 lb yield and round up36.67 ft³0.6 ft³→ 62 bags
- 5Check: the bags hold the order62 × 0.6 ft³ = 37.2 ft³, at least 36.67 ft³
Bags by bag size
| Bag size | Bags | Cost |
|---|---|---|
| 80 lb bag (yours) | 62 | – |
| 60 lb bag | 82 | – |
| 40 lb bag | 123 | – |
| 40 kg bag | 56 | – |
| 25 kg bag | 89 | – |
Bag yields are from the maker’s data sheet for 40, 60 and 80 lb bags; kilogram bags are scaled at the same yield per pound.
Already have some bags?
- They pour, after the allowance
- 5.45 ft³
- Slab at 4 in
- 16.4 ft²
- Bags this pour needs
- 62
How it's worked out
Every pour is a volume: the space the forms or the hole will hold. Convert each size to the same unit first; a 4 inch slab is a third of a foot thick, and that is where most mistakes start.
Steps are worked out as solid blocks standing on the ground. The first step is one rise tall, the second two, and so on, so a stair of n steps holds 1 + 2 + … + n blocks of rise × run × width.
Then the order. The volume is raised by your waste allowance, and divided by a bag's yield and rounded up for bags. The Quikrete Concrete Mix data sheet gives about 0.60 ft³ for an 80 lb bag, 0.45 for 60 lb and 0.30 for 40 lb. A cubic yard is 27 ft³, so one yard takes 45 bags of 80 lb, 60 of 60 lb or 90 of 40 lb.
Worked examples
Carlos pours a 10 by 10 ft patio
At 4 inches thick the patio holds 33.3 ft³, or 1.23 yd³. With 10% extra for uneven ground Carlos orders 1.36 yd³, which is 62 bags of 80 lb mix.
The concrete weighs about 5,500 lb once mixed. Making the slab 5 inches thick would take 77 bags, 15 more.
Priya sets eight fence posts
One hole 10 inches across and 36 inches deep holds 1.64 ft³, more than 2 bags of 80 lb, so a single hole takes 3. The posts themselves take up some of that space, which is ignored here.
For all eight holes with 10% extra, Priya needs 14.4 ft³, which is 24 bags of 80 lb or 32 of 60 lb.
Tom builds three front steps
Each block of one rise by one tread by 4 ft holds 2.14 ft³. Three steps stack 1 + 2 + 3 = 6 of those blocks, 12.8 ft³ in all.
With 10% extra Tom orders 14.1 ft³, which is 24 bags of 80 lb, the same count as the eight fence posts above.
Reading your result
Bags or ready-mix. A garage floor 24 by 24 ft at 6 inches, with 8% extra, is 11.5 yd³, or 519 bags of 80 lb. A pour that size is ordered from a ready-mix plant by the yard; bags suit post holes, small pads and repairs.
The weight uses 2,400 kg per cubic meter, a common planning figure for normal concrete. Quikrete gives its bagged mix as about 140 lb per cubic foot, so the weight here is on the heavy side, which is the safe side for planning a trailer or a floor.
The allowance covers spills, a soft spot in the ground and forms that bow out. Running short partway through leaves a weak joint where fresh concrete meets concrete that has started to set.
Common mistakes
- Entering inches as feet. A 4 ft thick slab is twelve times a 4 inch one. Check the unit beside each box.
- Rounding each post hole down. Mix for the total, then share it out, or work out bags per hole and round each one up.
- Forgetting the base. A slab needs a compacted gravel base under it; the volume here is the concrete only.
- Skipping the control joints. Quikrete's slab guide plans a patio at 4 inches of concrete on 3 to 4 inches of gravel, with joints cut at least every 10 ft each way so cracks form along them.