Process Capability
calculator.
Cp and Cpk compare the spread of your process with the limits your customer allows.
Leave LSL or USL blank for a one-sided limit. A blank target uses the midpoint.
- Cp
- 1.333
- Ppk
- 0.952
- Sigma level
- 4.36
Against the published minimums, the lower of Cpk and Ppk reads: Below 1.00, not capable. Cp is 1.333, so centering the process would gain more than cutting spread alone. Ppk trails Cpk, which points to drift between runs.
The process against its limits
A normal curve with mean 102 and standard deviation 2.8. The filled tails fall outside the limits, about 2,146.5 parts per million.
What would help most
| Change | Cpk | Ppk | ppm |
|---|---|---|---|
| As it is | 1.067 | 0.952 | 2,146 |
| Mean centered | 1.333 | 1.19 | 355 |
| Spread down 10% | 1.185 | 1.058 | 751 |
| Spread down 20% | 1.333 | 1.19 | 178 |
| Spread down 30% | 1.524 | 1.361 | 22 |
What it takes to reach a target
- Largest σ at this mean
- 2.005
- Mean must stay
- 99.975 to 100.025
Published minimums
| Use | Two limits | One limit |
|---|---|---|
| Existing process | 1.33 | 1.25 |
| New process, or critical on an existing one | 1.5 | 1.45 |
| New process and a critical variable | 1.67 | 1.6 |
From Montgomery (1996), as given in SAS's documentation. Your customer's figure comes first. Yours has two limits.
How sure is this Cpk?
- Margin at 95%
- ± 0.162
- 95% interval for Cpk
- 0.904 to 1.229
About 100 parts is the usual size for a capability study.
Working
- 1Compare the width of the limits with the spreadCp =110 − 906 × 2.5= 1.333
- 2Measure the room up to the upper limitCpu =110 − 1023 × 2.5= 1.067
- 3Measure the room down to the lower limitCpl =102 − 903 × 2.5= 1.6
- 4Cpk is the smaller of the twoCpk = 1.067
- 5Repeat with the long-term spread for Pp and PpkPp = 1.19, Ppk = 0.952, with a long-term standard deviation of 2.8
- 6Read the tails of the normal curve9.1 ppm below + 2,137.4 ppm above = 2,146.5 ppm
- 7Check: Cpk back to the distance from the nearer limit1.067 × 3 × 2.5 = 8, and the nearer limit is 8 from the mean
How it's worked out
Specification limits say what is acceptable: the lower limit LSL and the upper limit USL. The mean and standard deviation say what the process makes. Capability is about fit: if six standard deviations of output fit well inside the limits, almost every part conforms.
Cp ignores where the process sits, so it shows only what is possible. Cpk is the smaller of Cpu and Cpl, so a mean close to one limit pulls it down. NIST gives these formulas, along with Cpm, which also charges for distance from a target T:
The C indices here use the short-term spread within runs, and Pp and Ppk repeat the same sums with the long-term spread across all the data. With raw measurements, the short-term σ comes from the average moving range divided by 1.128, the d₂ constant NIST uses for an individuals chart. The long-term σ is the ordinary sample standard deviation. The parts-per-million figures are the tails of a normal curve with the long-term σ.
For counts of defects, DPMO is defects per million opportunities. The sigma level turns that rate into a z value and adds 1.5, a convention rather than a measured shift.
Worked examples
The NIST example: a process that sits off-center
With limits of 8 and 20, a mean of 16 and σ of 2, NIST gets Cp = 1, so the process would only just fit if it were centered. It is not. Cpu is 0.667 and Cpl is 1.333, so Cpk = 0.667.
That means about 22,782 parts per million outside the limits, 22,750 of them above the upper one. NIST's verdict is that this is not a good process.
Centering can beat a tighter process
Limits of 90 and 110 with σ of 2 give Cp = 1.667, which looks fine. With the mean at 104 and not 100, Cpk is only 1, and 1,350 parts per million fall outside.
Moving the mean to 100 lifts Cpk to 1.667 and cuts the rate to 0.57 parts per million. To reach 1.33 without moving the mean, you would need σ of about 1.5, a cut of about 25%.
Short-term against long-term
A mean of 102, a σ within runs of 2.5 and a long-term σ of 2.8 give Cpk = 1.067 and Ppk = 0.952. The gap of 0.11 is what drift between runs costs you.
The default raw measurements show the method: 15 readings have an average moving range of 2.486, which gives a short-term σ of 2.204. The sample standard deviation of the same readings is 1.526.
Reading your result
Check for stability first. NIST frames capability as a comparison of an in-control process with its limits. If the process drifts or spikes, the indices describe a moment, and the predicted rate will be wrong. Paste raw data and the tool flags any point outside the individuals chart limits.
Use the published minimums as a starting point. SAS's documentation lists Montgomery's minimums: for an existing process, 1.33 for a two-sided ratio and 1.25 for a one-sided ratio. iSixSigma says most businesses want a Cpk of at least 1.33, and 1.67 where staying in spec is critical. A contract may set its own figure.
| Index | To each limit | ppm |
|---|---|---|
| 0.67 | 2.01σ | 44,431.2 |
| 1 | 3σ | 2,699.8 |
| 1.33 | 4σ | 63.3 |
| 1.5 | 4.5σ | 6.8 |
| 1.67 | 5σ | 0.573 |
| 2 | 6σ | 0.002 |
Treat a sigma level as a convention. The 1.5 added means 6 sigma stands for 3.4 defects per million, not the 0.002 parts per million of a centered process with Cpk of 2.
| Sigma level | DPMO |
|---|---|
| 2σ | 308,537.5 |
| 3σ | 66,807.2 |
| 4σ | 6,209.7 |
| 5σ | 232.6 |
| 6σ | 3.4 |
Remember that a Cpk is an estimate. NIST's approximate interval puts a Cpk of 1.33 from 30 parts within about ±0.36, and from 100 parts within about ±0.2. NIST warns that the approximation needs at least 25 parts, and that capability studies need about 100.
Common mistakes
- Trusting the parts-per-million figure on skewed data. NIST notes that these statistics assume normal data. Flatness, roundness and impurity levels are often bounded at zero and lean to one side, which puts far more in one tail than the curve says.
- Mixing up Cpk and Ppk in a report. They differ only in which σ they use, and people use the names loosely. Agree which one the customer wants, and give the σ you used.
- Computing the short-term σ on shuffled data. The moving range compares each reading with the one before it, so the measurements must stay in time order.
- Quoting Cp alone. A Cp of 2 says nothing about whether the process is near a limit.